Free referral, not a programPros quote you directly
Main floor to basement unit

Contractors · Brampton

For contractors and renovators

Basement-unit builds, bathroom gut jobs and fit-outs all need glass near the end, when a late trade holds up inspection or handover. We are a free referral service, not a glazing company or a City program. Send us the scope and your dates, and we pass them to an independent local glass pro who does that kind of work: egress windows, shower glass, mirrors, railings or door glass.

  • Scopes and drawings welcome
  • Work sequenced to your inspections
  • One request for several trades' glass
Renovated bathroom seen from the hallway, with a frameless glass shower and matte black fixtures
Shower glass is measured once the tile is finished.

Basement units

Basement-unit projects: egress windows and openings permits

On a two-unit dwelling, the City's registration drawings show which egress option applies and where the egress and exit windows go. The City's two-unit process sets out current requirements. A new or enlarged basement window opening also needs a building permit under the openings permit package.

The glass pro supplies and fits the window. Share the drawing sheet that shows the egress and exit windows, so the window is sized to what was approved. Our basement egress window page covers the homeowner side.

Permit paperwork

What the openings package asks for

The City's package for new or enlarged openings asks for:

  1. A survey

    Showing the house on the lot, so the City can see where the opening sits.

  2. Elevations

    Drawings of the wall with the new or enlarged opening marked.

  3. Lintel details

    How the opening is supported above. This comes from whoever prepares your drawings.

Bathrooms

Bathrooms: shower glass after tile, mirrors

Mirrors

Vanity and wall mirrors cut to the finished wall, with openings for outlets or lighting. See mirrors.

Stairs and interiors

Railings and interior glass

Glass in guards has to be laminated or tempered safety glass, and guard heights follow the code, so railing work is quoted from your drawings and site measurements. The 2024 Ontario Building Code applies to permit applications now, so check wording against that edition. See glass railings. Interior partitions and door glass follow the same measure-then-order sequence.

Pricing

Sending a job for pricing

Send drawings or a written scope. The quote depends on:

  • Number, size and type of windows or glass pieces
  • Whether a foundation opening is new or enlarged
  • Shower, mirror or railing hardware and glass type
  • Access, site readiness and your inspection dates

Ask for a written, itemized quote with the scope, completion date and warranty spelled out.

Send a scope for pricing

Free quotes from independent local pros.

Condos

Condo and townhouse jobs: permission to construct

Where permit work touches a registered condo's common elements, the City asks for a Notice of Permission to Construct signed by the condominium corporation, as set out in the openings package. Get it before glass is ordered.

Occupied homes

Occupied-home jobs: tenants and dust control

Many basement-unit projects happen with a family upstairs or a tenant next door. Tell the pro who lives there, which entrance to use and when work can be noisy. Ask for dust control around concrete cutting, and a tidy finish each day. Landlords sending turnover work can use our property manager page.

Questions

Contractor questions

Explore your options

Local glass pros work with renovators and builders across the city, including Springdale, Bramalea, Heart Lake and Castlemore.

Send drawings or a scope

Include the address, the glass work and your target dates. We'll pass it to a local glass pro who can price it.